Help centre

Straightforward help for setting up tournaments, adding teams, building fixtures, entering scores, and running the day with less stress.

Walkthrough
Estimated read: 4 min

Scheduling board walkthrough for organisers

Understand what each part of the scheduling board is showing you before you start moving fixtures around.

What this page is for

The scheduling board is your live planning view. It should tell you what is placed, what is unplaced, and what still needs fixing.

Main areas on this page

Pitch canvas

Shows the fixtures already placed by pitch and time.

Issues panel

Lists clashes, rest problems, and capacity warnings that still need action.

Unscheduled list

Shows fixtures left to place when there is not enough room or when you are still planning.

Typical flow

  1. 1
    Read the issues panel first.
  2. 2
    Check the unscheduled list second.
  3. 3
    Then move or schedule fixtures on the pitch canvas.

Important checks

  • The issues panel is understandable without guesswork.
  • Unscheduled fixtures are visible and accounted for.
  • The board reflects the real matchday order you want.

Common questions

Should autoscheduler ever overlap fixtures?

No. It should leave overflow fixtures unscheduled instead.

What should I do if a pitch size is short on time?

Add another pitch of that size, shorten match timing, or extend matchday hours.